The first floor of apartment 4 is now finished but the utility room below needed some fine finishing whilst keeping that rustic appearence.

Whereever possible the original stones are kept and the joints repointed with Chaux which is a lime mix and allows the walls to breathe and dry out.

So over the past couple of weeks, the guys have been sweating away at the walls under gîte 4. Here are some photos of before and after for you to enjoy!

Volunteer_James_mixing_chauxPaul_watering_wallOn the left: Paul getting the wall ready.

 

On the right: James mixing the chaux for the wall.

 

This is Emily’s last post before leaving for her work in Paris

About La Giraudiere

The whole idea of the La Giraudiere project is for people of all backgrounds, all ages, all nationalities to have the chance to live together learn about each others lifestyle exchange their knowledge, experiences and skills whilst living and working together in France and at the same time helping, improving and adding to the Project for those to come in the future. To see the different types of volunteers work that has been done and what is still required visit our website
This entry was posted in Uncategorized and tagged , , , . Bookmark the permalink.